Abstract views: 35 / PDF downloads: 166Keywords:
Hydroelectric power plant, environmental impact, landscape evaluation.Abstract
The demand for energy is getting increased in parallel with the population growth as well as industrial and technological progress. In
that sense hydroelectric power plants is by far the most common method of large scale electric power generation. On the other hand, those
plant constructions have potential environmental impacts. The Landscape Development Plan (LDP) to be prepared before the plant
construction as an integral part of the entire hydroelectric power generation project, then, is getting of importance to be able to reduce
adverse impacts. The impacts of the project over landscape elements and processes, as well as the impacts of the environment over the
project itself are assessed by LDP. As a final benefit, the sustainable restoration and management strategies would be produced.
In this study, the LDP Model is identified by which potential impacts over landscape and strategies for their management to be
addressed, using some case studies in which spatial analyses were carried out with the help of Geographical Information Sytems. As a
result of that LDP model for hydroelectric power station and dam projects, landscape strategies for nature conservation and landscape
restoration, visual landscape improvements and recreational usage potential will be produced. The described LDP model could be
efficiently used for other types of major construction projects.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2014 Türk Bilimsel Derlemeler Dergisi
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.